Phase 1
Experimental model of testing and comparative evaluation of traditional and innovative composite materials for use in special constructions, with high degree of impermeability, chemical attack resistance and ability of contaminants immobilizing.
Delivery time: december 2014
Phase 1 value
Total: 133.022 RON
Source 1: Public budget: 120.000 RON
Source 2: Own budget: 13.022 RON
Expected results and obtained results (Phase 1)
Phase 2
Experimental models of innovative composites achieving – binders and grouts on the secondary raw materials basis for using in special construction works.
Delivery time phase 2: december 2015
Phase 2 value
Total: 322.437 RON
Source 1: Public budget: 272.459 RON
Source 2: Own budget: 49.978 RON
Expected results and obtained results (Phase 2)
Phase 3
Experimental models of the innovative composites achievement - functional performance of the grouts and concretes. Preliminary demonstration of engineering and environmental characteristics required for special construction applications
Delivery time phase 3: june 2016
Total: 324.052 RON
Source 1: Public budget: 289.642 RON
Source 2: Own budget: 34.410 RON
Report phase 3
Expected results and obtained results (Phase 3)
Phase 4
Experimental models of the innovative composites achievement - functional performance of the grouts and concretes. Demonstration of engineering and environmental characteristics required for special construction applications
Delivery time phase 4: september 2017
Total: 255.490 RON
Source 1: Public budget: 217.899 RON
Source 2: Own budget: 37.591 RON
Expected results and obtained results (Phase 4)